Awnings for loading and unloading operations
The speed of construction is a key and decisive advantage in favor of using frame-tent structures for loading and unloading terminals. The period from the decision to build to the commissioning of the facility is 1-2 months (in some cases, up to 4-5 months). Traditional capital construction usually takes 10-12 times longer. The status of temporary structures gives mobile structures another important advantage: the absence of approval documentation for their construction. Mobile structures can be moved to a new location, optimized in size, and sold in the event of site reorganization or preservation. Thus, tents have much greater commercial adaptability than fixed structures. They can be incorporated into an existing location, adding life and improving the visual experience, which is particularly important for aviation and railway terminals.