The gable tent was installed at the end of September 2022 to host a dinner for the company's employees who were undergoing training at the Skolkovo Innovation Center. The construction of the tent on the premises was the optimal logistical solution.
The total area of the structure is 1,000 m². All the technical requirements of the event are provided for, including heating inside the tent, a kitchen area for high-quality catering in the form of a gala dinner for 320 people, and a dressing room for the performers. Additionally, we have considered the microclimate inside the tent to prevent condensation on the walls.
The transparent PVC tent on the black anodized frame, combined with the autumn-themed interior design, creates an impressive atmosphere and interior design for the tent.